Flood defence works, Whittlesey Washes
Team Van Oord

Flood defence works, Whittlesey Washes

The brief

We worked with our client, Team Van Oord, to facilitate Phase 2 of the Whittlesey Washes flood defence scheme. The £26m scheme involves strengthening a 16km stretch of the south bank between Whittlesey and Stanground. The scheme is designed to protect 8,000 hectares of farmland and hundreds of homes, as well as infrastructure around Peterborough.

What we did

  • We supplied and installed 7km of demarcation fencing.
  • We cut up to 26ha of ruderal grassland with a bat wing mower.
  • We supplied and installed 3km of concrete post rabbit fencing.
  • We supplied and installed 6.5km of concrete post stock fencing.
  • We supplied and installed 10 stiles and 9 field gates.
  • We hydroseeded 5.5ha with flexterra.
  • We conventionally seeded 37ha with a deep rooting grass mix.

The outcome

Working closely alongside our client, we were able to mitigate the risk of potential programme delays and have worked collaboratively to ensure the delivery of the works.

Working closely alongside our client, we were able to mitigate the risk of potential programme delays and have worked collaboratively to ensure the delivery of the works.
Thomson project manager, flood defence works, Whittlesey Washes
Our services
Environmental consultancy services covering all ecosystems

We cover all aspects of environmental consultation – from smaller surveys through to strategic projects.

Our culture and values
Our culture and R.I.S.E. values help bind us together as a business

At Thomson, we strive to deliver a pragmatic and innovative approach to environmental compliance.

Working in partnership with our clients, our team of environmental specialists ensures objectives are met, with maximum efficiency for our clients, and minimal impact on the natural world.

Projects Flood defence works, Whittlesey Washes